Substantial Site Work & Roadway Improvements
Originally home to the closed Burlington Mall, the site required substantial clearing and preparation following demolition of the original mall structure and various customizations to support the new multi-tenant redevelopment plans. Highlights include:
- The existing on-site wetland basin was merged into two larger wetland basins. Stormwater management also included installation of three wet ponds and a large infiltration basin.
- A dedicated sanitary sewer system was installed in alignment with township requirements.
- Penntex worked with local electric provider PSE&G to install a primary loop system to power the site.
- Traffic signal upgrades, lane widening, the addition of turning lanes, and bike path repairs ensured the site and its surrounding areas were equipped for the increased traffic.
Sustainable Warehouse Construction & Subsequent Tenant Fit-Out
Following construction of two initial spec warehouses (Building 1 & Building 2), subsequent tenant fit-out customized the spaces. As part of delivering sustainable solutions, Penntex was able to reuse over 85,000 cubic yards of millings and 103,000 cubic yards of crushed concrete from the mall demolition as part of construction of the building pads. Construction of the third warehouse is set for a future date